
Place in the drying chamber the
components of the temperature
adjustment set:
• Drying chamber shield
with assembled control
thermometer
After assembling the adjustment
set close drying chamber’s lid
and start the temperature
adjustment process.
CAUTION: remember to carry out all the processes with great care not to
damage the mass measuring mechanism of a moisture analyzer.
Komentáře k této Příručce