Radwag MYA 5.3Y.F1 Microbalance Uživatelský manuál Strana 10

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 198
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 9
- 10 -
2. UNPACKING AND INSTALLATION
Carefully unpack the balance, remove plastic, cardboard and foil packagings
together with protective elements and using gently movements place the
balance onto its location. Assembly the weighing pan and other elements
following the diagram.
After installing the balance at the operating place, following elements should be
set in a given order:
1 pan shield
2 bottom ring
3 balance pan
4 glass cover
After the elements setting, additional devices should be connected and balance
should be plugged to power source. Power socket is located at the back side of
an electronic module.
Zobrazit stránku 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 197 198

Komentáře k této Příručce

Žádné komentáře